White Mesa Uranium Mill Upgrades
After several years of minimal operation and no maintenance, Denison Mines elected to upgrade and restart the White Mesa facility. Precision Systems Engineering was contracted to assist with three main components of the upgrade: the modification of the existing uranium mill, the mitigation of vanadium dust/fumes, and the design of an alternative feedstock processing system.
MULTIDISCIPLINE CONSULTING SERVICES PROVIDED:
MECHANICAL ENGINEERING:
Replacement of Uranium Circuit Clarifier and Raffinate Tanks
Replacement of Uranium and Vanadium Solvent Extraction Tanks
Design of Tanks, Pumps, Conveyors, Filter Presses, Agitators and Steam Sparging for Feedstock Process
CIVIL/ENVIRONMENTAL ENGINEERING:
Design of Sodium Chlorate Containment
Design of Solvent Extraction and Raffinate Tank Containment
Re-design of Vanadium Fume Exhaust System
Implemented New Scrubber for External Exhaust at Vanadium Facility
CONSTRUCTION PHASE:
Preparation of Tank Specifications and RFQ
Review and Evaluation of Vendor Proposals
Construction Management
ELECTRICAL ENGINEERING:
Electrical Schematics
Wiring Diagrams
Motor Control Center
Instrumentation Specification and Purchasing Physical Layout Drawings
Lighting and Grounding Design Drawings
Piping & Instrumentation Diagrams
Operating and Interlock Description
Automated PLC Controls with HMI Calibration and Field Check-Out
Start-Up Construction Management
CONTROLS ENGINEERING:
Drum Dump Machine