Fly Ash Load-out facilities
PSE provided civil, structural, mechanical, and electrical engineering, as well as instrumentation and controls design for fly ash load-out systems at fourteen of our client’s coal-fired power plants. The project included designing a 120-foot cantilever structure over the Red River in Louisiana to support barge-loading equipment, material and personnel.
Services Provided:
MECHANICAL ENGINEERING:
Design of storage silos, bag houses, air slide conveyors and bucket elevators
Design of piping, screw conveyors, and other material transfer components
Telescoping chute design for simultaneous loading of up to six barges
STRUCTURAL ENGINEERING:
Design of truck and train loading structures
Design of 120-ft cantilever frame for barge loading equipment
Specification and design of footings, foundations and platforms
Pipe support design
Design of 120 ft x 320 ft fly ash storage building
CIVIL/ENVIRONMENTAL ENGINEERING:
Dust suppression design
ELECTRICAL ENGINEERING:
Power transmission and distribution for load-out facilities
Design and specification of instrumentation for material transfer systems
Electrical design for storage building and conveyor systems
PROJECT MANAGEMENT:
Managed scope, schedule and budget
Handled all document control
CONSTRUCTION PHASE:
Construction management