Organo-Clay Processing Facility
The facility combines a Hectorite clay with a quaternary amine and other compounds to produce a high temperature drilling mud designed to meet the more demanding specifications required by new horizontal drilling technologies. The project started with the development of the Process Flow Diagrams and continued through the detail design and construction support. This grassroots organo-clay processing plant required retrofitting a new multi-story facility into an existing structure.
Many variables needed to be studied and considered, but the two items which presented the greatest challenge were the explosive nature of the organo-clay (the client’s final product) and the handling of the ethyl alcohol discharge stream. The integration process required understanding, organizing and analyzing many details and their impact on the process equipment, air quality, and the quality and throughput of the organo-clay. PSE had to engineer the integration of the Hammer Mill Dryer and the Thermal Oxidizer both mechanically and from an automation stand point. Balancing the air flows of multiple exhaust streams into the Thermal Oxidizer required PSE to facilitate the collaboration of all of the vendor’s engineers along with our process, mechanical and controls engineers to solve the integration problems.
Services Provided:
ENVIRONMENTAL ENGINEERING:
Air quality permit support
PROCESS ENGINEERING:
Developed the Process Flow
Developed the Mass Balance
Developed the Process and Calculated the evaporation rate sizing, specifying and selecting
Equipment layout
Design of surge bins
Develop construction bid equipment, instructions
Diagrams (PFDs)
Facilitated the Process Hazard
Instrumentation Diagram (P&IDs) of the quaternary amine solution at different process transitions.
Analysis (PHA)
CIVIL/STRUCTURAL ENGINEERING:
As-Built the existing building
Design existing building
Design new building addition
Design all footings, foundations, modifications
MECHANICAL ENGINEERING:
Design all steel support grade beam modifications and concrete pads structures
Develop construction bid instructions
ELECTRICAL ENGINEERING:
Sizing, specifying and selecting
Design new power distribution
Design lighting, lightning equipment
Develop construction bid
Protection and grounding systems
Instructions
CONTROLS ENGINEERING:
Developed a functional
Developed an I/O List and Developed interlock matrix
Developed the PLC and HMI
Integrated the vendors code
Designed and built the control
Managed scope, schedule and description
Drawings, Code, Panel, Budget
PROJECT MANAGEMENT:
Handled all document control
Managed vendor review
Procurement
CONSTRUCTION PHASE:
Review contractor and vendor
Design changes based on packages and RFI’s submittals
Vendor changes