Copper Processing Facility Relocation
This unique project involved moving an entire mining and processing facility, from Nevada to Southeastern Utah. PSE’s involvement included process analysis to bring the plant into compliance with current best practices for process, equipment, controls and regulatory requirements. Our engineers modified the process to incorporate the philosophy of the new owner. In addition, PSE designed the substation and power distribution for the new facility site.
Services Provided:
PROCESS ENGINEERING:
Redesign of solvent extraction and electro winning areas
Comprehensive survey of existing plant equipment
Design of new crushing areas
CONTROLS ENGINEERING:
Control building specifications
PLC installation and programming
STRUCTURAL ENGINEERING:
Substation foundation and supports
Structural design for wood power distribution poles
Foundation for pre-fabricated control building
ELECTRICAL ENGINEERING:
138 kV/13.8 kV (10 MVA) substation design
Grounding grid design
Tap into existing 138kV overland transmission lines
Metering package interface
Primary and secondary overhead distribution protection
13.8 kV power distribution system design
PROJECT MANAGEMENT:
Managed scope, schedule and budget
Handled all document control
CONSTRUCTION PHASE:
Equipment specifications and recommendations
Evaluation of equipment cost quotes